Weekend of work
It was a weekend full of work but at least something did get done. Cool. After Friday the walls were pretty much done, only some small pieces needed so it was time to focus on floor and ceiling.
There were some bigger gaps and dents and bumps in the floor of the dust free side and as there is probably chairs with wheels used there and also possibly machinery with wheels we decided to fill the dips a bit to make it more wheel friendly.
The ceiling of kitchen also needed some TLC as it was missing a piece. Luckily we had more than enough of suitable board to cover up the hole and make the kitchen look a lot more ready. Now it is waiting for the furniture, closets and machinery.
While the dust free side was worked on there was also lots of movement on the woodwork side. Huge piles of boxes and flocks of wood was moved, removed and replaced and a shelf is almost ready to store some more stuff.
After the floor screed had settled it was time to finish the floor. Nice layer of great floor paint with the compliments of Stark Vaasa was painted as a last job of Sunday.
What next?